One of the benefits of wind farm construction projects is that it remains a fast driven energy production. In addition to economic benefits, wind farms are helping to make energy production more environmentally friendly.
The rapid growth of the industry is due to both investor interest and phenomenal successes in the design of Wind energy projects financing, turbines and an increase in the capacity of generators.
Wind farm construction projects are implemented by requirements of gains and economic growth and sustainability.
Wind power is developing rapidly in Europe and around the world.
Over the past 5 years, wind power accounts for more than one third of all installed generators in the world.
SCM LOANS LIMITED provides clients with affordable financing for related power and wind energy projects for many years.
The construction and launching of a wind power plant, as a rule, takes from 6 to 18 months, depending on the size of the project, the terrain, the difficulties of connecting to the distribution grid, as well as the delivery and installation of turbines.
At SCM LOANS LIMITED, we assist in the implementation of Wind farm construction projects financing. Our financing is affordable with a flexible terms.
Wind farm construction projects financing is the main areas of our work.
Want to learn more about new investment opportunities?
Contact our representative.
We are financing wind energy investment projects around the world.
Many entrepreneurs have ideas and even suitable sites for the construction of a wind farm, but there are no available funds for the implementation of the project.
Wind power plant construction step by step
The construction phase of wind energy begins with engineering. In the design of wind farms, the results of topographic surveys are used to determine the characteristics of elevations and soil. Specialists also use geotechnical survey data and soil resistivity tests for the electrical grounding system.
This information affects the location of key elements such as a wind turbine, transformer and high voltage substation. After determining the location of the main elements, engineers can calculate the distribution of electricity and plan cable routes.
In addition to careful monitoring and reporting at each stage of work, we stay in touch with the investor in order to make adjustments to the approved project if necessary. After installing the equipment, engineers organize the testing and commissioning of a wind turbine.
Wind power plant construction requires experience in engineering, electrical engineering, architecture, logistics, and project management. You need a team of highly qualified professionals.
Financing wind energy projects : construction step by step
To deliver to the place, install, and connect this equipment to the electric grid, you will need large-scale construction project. One of the first steps in the construction process is the clearing of the territory and the arrangement of gravel access roads. Access roads are built from existing public roads to the construction site to provide access to equipment for construction, ongoing operation and maintenance.
The wind turbine consists of four main parts: foundation, tower, gondola and rotor with blades.
The rotor converts wind energy into rotational motion. The gondola contains an electric generator and other components that convert the mechanical rotation of the rotor into electricity. The tower supports the gondola and rotor on a reinforced concrete foundation.
This whole structure, generating power from several hundred kilowatts to almost 8 megawatts, reaches 120 meters in height and has a rotor diameter of up to 150 meters. The weight of a modern wind generator can reach several thousand tons.
Temporary access roads are being built in a corridor about 12-15 meters wide. Before laying the gravel, the topsoil is removed, the soil is compacted and a heavy-duty coating is laid. After the construction is completed, access roads are converted into permanent roads about 5 meters wide.
The wind power plant has a numerous underground electrical cables that run from each turbine to the grid. Requirements for trenches for laying cables, including the minimum depth, varies depending on your national standards and the features of the project.
Modernization, operation and maintenance of wind farms
Wind farm maintenance is any process aimed at maintaining wind turbines in good working order. Maintenance includes regular lubrication of moving parts (gears, bearings), checking the connection inside the systems, urgent solution of technical problems and setting up equipment.
When the wind turbine requires maintenance, we appoint a responsible specialist and immediately resolve the issue.
Proper operation and maintenance (O&M) maximizes wind turbine performance and extends its life.
Currently, the operation and maintenance of wind farms costs tens of thousands of euros per megawatt.
For example, in the United States, the average annual O&M cost exceeds $ 50,000 per MW and grows by 3-5% per year.
When the wind turbine requires maintenance, we appoint a responsible specialist and immediately resolve the issue.
Offering personalized financial and technical solutions with optimal cost for Wind farm construction projects financing. We take care of the owner,